news.today
Hello · Register today | LoginHello · My Account[—] [34]
UK

16 Cambridgeshire road closures scheduled for week of November 2

Summarised from 2 outlets · Updated 1 Nov, 10:48 · Archive

Sixteen road closures are scheduled across Cambridgeshire during the week beginning November 2.

Sixteen road closures are scheduled across Cambridgeshire for the week beginning November 2. Motorists are advised to plan journeys carefully and check before travelling, as the closures could significantly affect local traffic.

The works span multiple utility companies and maintenance contractors. City Fibre is carrying out works on two separate roads, including one closure until November 3 between 8am and 6pm. Openreach has closures scheduled for November 4-5 and on November 2 between 6am and 6pm. Anglian Water has works running from November 2-4 and November 3-5.

Network Rail is undertaking works from November 2-4 between 9.30pm and 5am. The council is also conducting surface dressing patching works and carriageway resurfacing, with most night-time closures running between 9pm and 5am or 6am. Drain jetting and cleansing work is scheduled for November 2 and November 3-4. One road will be closed for carriageway works from November 2-16 during night-time hours only.

16 Cambridgeshire road closures scheduled for week of November 2
Image: Cambs Times

Comments (0)

How it is being reported

In this story: Cambridgeshire · City Fibre · Openreach · Anglian Water · Network Rail

This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log