Ullock Bridge in Cumberland to close for six-week strengthening project
Summarised from 2 outlets · Updated 26 Oct, 17:02 · Archive
Ullock Bridge in Cumberland will close from November 2 for six weeks of strengthening works costing £27.3 million.
Ullock Bridge on the C2030 in Cumberland will close from November 2 for six weeks as part of a £27.3 million investment to improve the area's highway network. The project includes installing a reinforced concrete saddle to extend the bridge's lifespan and ensure long-term safety for the community.
The road will be fully closed throughout the project with no access for vehicles, pedestrians, emergency services or dismounted cyclists at any time. A signed diversion will be in place for the duration of the closure.
Cumberland Council said the scheme is part of its wider efforts to keep infrastructure safe, resilient and functional for the future. Work is expected to be completed by mid-December, weather permitting.
How it is being reported
- Bridge to close for six weeks for vital strengthening worksUllock Bridge in Cumberland will close from November 2 for six weeks as strengthening works begin, with a diversion in place during the £27.3m project.Whitehaven News · 26 Oct, 14:57
- Bridge to close for six weeks for vital strengthening worksUllock Bridge in Cumberland will close from November 2 for six weeks as strengthening works begin, with a diversion in place during the £27.3m project.Cumberland News · 26 Oct, 14:57
In this story: Ullock Bridge · Cumberland · Cumberland Council
This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem
Comments (0)