news.today
Hello · Register today | LoginHello · My Account[—] [32]
UK

Clitheroe swimming pool to reopen after £4.25m refurbishment

Summarised from 2 outlets · Updated 23 Oct, 08:38 · Archive

Ribblesdale Pool in Clitheroe will reopen on 9 November after a £4.25 million refurbishment extending its lifespan by 15 years.

Ribblesdale Swimming Pool in Clitheroe will reopen to the public on 9 November following a £4.25 million refurbishment that closed the facility for seven months from April. Ribble Valley Borough Council decided to refurbish the pool rather than demolish and rebuild it after surveys showed it needed upgrades to reduce energy costs and maintain infrastructure. The work is expected to extend the facility's lifespan by 15 years.

The refurbishment included installation of new mechanical and electrical systems, water filtration and heating equipment, and replacement of the main pool lining. Anti-slip surfacing was added around the poolside and changing rooms, and the reception area and changing rooms were improved. Adam Allen, director for community services at the council, noted that over a million pounds was spent on the plant room, boilers and filtration system alone. The deep end has been reduced from three metres to two metres deep, though it remains suitable for diving.

An online booking system for adult and children's swimming lessons has been introduced to make booking easier and free up staff. The council said the programme of swimming lessons has been revamped with more lessons scheduled. An official unveiling of the pool will take place on 12 November.

Clitheroe swimming pool to reopen after £4.25m refurbishment
Image: LancsLive

Comments (0)

How it is being reported

In this story: Ribblesdale Pool · Clitheroe · Ribble Valley Borough Council · Adam Allen

This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem