Data centre planned for rural Bedfordshire near Milton Ernest
Summarised from 2 outlets · Updated 17 Nov, 13:08 · Archive
A company plans to build a data centre on Thurleigh Road between Milton Ernest and Thurleigh in Bedfordshire.
Pace DC is proposing to build a data centre on Thurleigh Road between Milton Ernest and Thurleigh in rural Bedfordshire. The company says the facility could generate up to £3.5m in annual business rates once operational and support approximately 80 full-time jobs.
The project would connect directly to a consented solar farm and battery energy storage system on Thurleigh Road, drawing on renewable generation while maintaining a grid connection for when solar energy is unavailable. The design would include a closed-loop cooling system to avoid ongoing water consumption for cooling, and the company is exploring ways to reuse waste heat locally.
Pace DC said it is in the early stages of the planning process and wants to hear the views of local residents. A public consultation event will be held on 18 November between 16:00 and 22:00 GMT at Milton Ernest Village Hall. The company said feedback would inform the proposals ahead of any planning application.

How it is being reported
- Have your say: Public meeting about Bedford data centre being held TOMORROWA data centre could be coming here and you’ve got a chance to air your views.Bedford Today · 17 Nov, 12:08
- Consultation event over proposed data centreA public event on the plans for near Thurleigh and Milton Ernest will be held on 18 November.BBC Beds Bucks And Herts · 17 Nov, 06:45
In this story: Pace DC · Thurleigh · Milton Ernest · Bedfordshire · Bedford
This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log
Comments (0)