news.today
Hello · Register today | LoginHello · My Account[—] [33]
UK

Cumbrian bridge closes for six-week strengthening works

Summarised from 3 outlets · Updated 2 Nov, 09:21 · Archive

Ullock Bridge in Cumbria closes for six weeks from Monday for essential strengthening work.

Ullock Bridge on the C2030 in Cumbria closes for six weeks from Monday, November 2, for essential strengthening work intended to extend the life of the structure and ensure it remains safe. The scheme involves the installation of a reinforced concrete saddle to strengthen the bridge.

Work is expected to take around six weeks, although this will be subject to weather conditions and operational requirements. A full road closure will remain in place throughout the project, with a signed diversion route available for motorists. No access will be permitted to the site at any time while work is underway, including for vehicles, pedestrians, dismounted cyclists and emergency service vehicles. The restriction will remain in force outside working hours.

The council said the scheme forms part of its £27.3 million investment in maintaining and improving the area's highway network, with the wider programme intended to ensure roads and other infrastructure remain safe, resilient and fit for the future. Road users can check live and planned roadworks through one.network or contact the council's Highways Hotline on 0300 373 3736.

Cumbrian bridge closes for six-week strengthening works
Image: Cumberland News

Comments (0)

How it is being reported

In this story: Ullock Bridge · Cumbria · C2030

This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log