news.today
Hello · Register today | LoginHello · My Account[—] [33]
UK

Oxfordshire fusion machine gets 12-tonne upgrade

Summarised from 2 outlets · Updated 7 Nov, 16:52 · Archive

A 12-tonne beam box has been installed on MAST Upgrade, the UK's flagship fusion machine, to double its heating power.

A 12-tonne 'double beam box' has been installed at MAST Upgrade, the UK's flagship fusion machine at the Culham Campus near Abingdon. The equipment doubles the machine's heating power and enables scientists to study plasma conditions needed for future fusion power plants.

The double beam box houses two neutral beam injectors that fire high-energy neutral atoms into plasma to raise its temperature. With this addition, MAST Upgrade's neutral beam heating power will increase from 4.4 megawatts to 8.8 megawatts, allowing plasma temperatures to reach up to 60 million degrees Celsius.

Andrew Thornton, Head of MAST Upgrade Operations at the UK Atomic Energy Authority, said: 'The lift of the double beam box is a huge step forward for MAST Upgrade. By doubling our heating power, we will explore plasma conditions we simply couldn't reach before.' He added that the upgrade will enable testing of how the exhaust system handles hotter, higher-performance plasmas.

The research will investigate technologies and physics for future fusion plants, including the UK's prototype fusion power plant, STEP. The double beam box is part of a broader engineering upgrade for MAST Upgrade.

Oxfordshire fusion machine gets 12-tonne upgrade
Image: Oxford Mail

Comments (0)

How it is being reported

In this story: MAST Upgrade · UK Atomic Energy Authority · Culham Campus · Abingdon · Andrew Thornton · STEP

This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log