news.today
Hello · Register today | LoginHello · My Account[—] [32]
UK

Renfrew Bridge to close for months after Storm Boelo damage

Summarised from 3 outlets · Updated 28 Oct, 17:15 · Archive

The £117m Renfrew Bridge will close for several months after Storm Boelo flooding damaged its electrical systems.

The £117m Renfrew Bridge, which links Renfrew with Yoker, Clydebank, West Dunbartonshire and Glasgow, will close from 28 October at 8pm for several months following flooding during Storm Boelo. The bridge's electrical systems suffered significant damage to the hydraulic controls on the Renfrew side, with extensive harm reported in one of the two operating plant rooms that manage the opening and closing mechanism.

The closure came after a tidal surge of up to 6.7 metres—the highest recorded since digital records began in 1998 and more than twice the forecast level—caused the River Clyde to break its banks. Water poured into Renfrew's streets, and the plant room on the Renfrew side sustained serious water damage while the plant room on the opposite side suffered minimal impact.

Renfrewshire Council's Head of Climate, Public Protection and Roads, Gerard Hannah, said: 'We're very sorry for the inconvenience this will cause all those who use the bridge. Urgent work is underway to identify the issues behind the damage and get the bridge back into action as soon as possible.' River traffic will continue to operate normally during the repairs.

Renfrew Bridge to close for months after Storm Boelo damage
Image: BBC Glasgow And West

Comments (0)

How it is being reported

In this story: Renfrew Bridge · River Clyde · Storm Boelo · Renfrewshire Council · Gerard Hannah · Renfrew · West Dunbartonshire

This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log