Arizona begins third phase of I-10 expansion between Phoenix and Casa Grande
Summarised from 2 outlets · 3 reports · Updated 8 Oct, 15:37 · Archive
The Arizona Department of Transportation has begun the third phase of a near-$1 billion project to widen Interstate 10 between Phoenix and Casa Grande.
The Arizona Department of Transportation (ADOT) has started the third phase of the Wild Horse Pass Corridor Project, a near-$1 billion initiative to widen Interstate 10 between Phoenix and Casa Grande. Work began on an 11-mile stretch between Loop 202 and the Gila River in both directions, according to ADOT representatives on Monday.
The construction will add a third general-purpose lane in each direction and a high-occupancy vehicle lane between Loop 202 and Riggs Road. Crews will also reconstruct interchanges at Wild Horse Pass Boulevard, Riggs Road and Queen Creek Road/State Route 347, and build a new interchange at Koli Road. Traffic safety features including overhead messaging boards, freeway cameras and wrong-way detection systems will be installed.
The project spans 26 miles in four segments. The first segment, which began in May 2024, involved replacing I-10 bridges over the Gila River; finishing work is scheduled for next month. The second phase kicked off in January 2026 and covers the stretch from Gas Line Road to near Casa Grande. Construction on the fourth segment between the Gila River and Gas Line Road is anticipated to start in 2027. The entire project aims to reduce congestion on the major commuter route and is expected to be completed by late 2029.
How it is being reported
- Construction begins on 11-mile stretch of I-10 between Phoenix, Casa GrandeCrews have begun construction on an 11-mile stretch of Interstate 10 as part of a project to expand the corridor between Phoenix and Casa Grande.Azfamily · 8 Oct, 15:01
- Third phase of ADOT’s I-10 expansion project underwayADOT has started the third phase of its massive, years-long project to widen Interstate 10 between Phoenix and Casa Grande.Azfamily · 6 Oct, 23:07
- Third phase of ADOT’s I-10 expansion project underwayADOT has started the third phase of its massive, years-long project to widen Interstate 10 between Phoenix and Casa Grande.KOLD · 6 Oct, 23:07
In this story: Arizona Department of Transportation · Interstate 10 · Phoenix · Casa Grande
This summary was written by AI from the headlines and standfirsts above, and states as fact only what at least two outlets report. How we use AI · Report a problem · Corrections log
Comments (0)